|
Q:
My drilling estimate calls for casing. How much do I need and why?
A: The well is
lined with a steel or plastic “casing” to prevent soil from
collapsing into the borehole; groundwater and contaminants from entering
the well; and to create an unobstructed conduit for the water to be brought
to the surface. Georgia law requires that the casing be placed 5 feet
into bedrock which normally can be reached by drilling anywhere from 10-80
feet.
|